
Laboratory acceptance is the key link in laboratory construction project. After most laboratory decoration and construction are completed, it is difficult to find the hidden dangers and defects. When SLD laboratory technology is working out the laboratory
Contact us
Advisory number:0086+4008-580-360
Service module
Service process
Related norms
- General Principles for the Design of Clinical Laboratories (GB/T 20469-2006)
- "Technical Specifications for the Construction of Biosafety Laboratories" (GB50346-2004)
- "General Requirements for Biosafety in Laboratories" (GB19489-2004)
- "Codes for the Design of Clean Workshops" (GB50073-2001)
- "Codes for Fire Protection in Architectural Design" (GBJ16-87) (2001 edition)
- "Codes for the Design and Acceptance of Clean Rooms" (JG71-90)
- "Building Flo Design Code (GB50037-96)
- "Code for Design of Water Supply and Drainage for Buildings (GBJ15-88)
- "Code for Construction and Acceptance of Ventilation and Air Conditioning Engineering"(GB50243-97)
- "Code for Design and Acceptance of Ventilation and Air Conditioning Engineering"(GB50243-2002)
- "Code for Design and Acceptance of Heating Ventilation and Air Conditioning"(GBJ19-2003)
- "Code for Design and Acceptance of Industrial Pipeline Engineering"(GBJ235-82)
- Distribution Design Code (GB50054-95)
- "Design Code for Low Voltage Distribution System" (GB50052-95)
- "Design and Acceptance Code for Grounding Devices in Electrical Equipment Installation Engineering Design" (GB50169-92)
