【Entry name】:The Overall Solutions of STI Lab
【Project area】:7000m2
【Project results】:Completed lab design and furnishing; got CMA\CATL\CNAS certificates.
With the improvement of people's quality of life, precious metal jewelry plays an important role in people's lives. The institutions of the precious metal testing lab must meet the CNAS-CL01 “Accreditation Criteria for the Competence of Testing and Calibration Laboratories” and CNAS-CL24 “Guidance on the Application of Lab Competence Accreditation Criteria in Jewelry and Precious Metal Testing”.
1. Vibration and noise are ambient conditions that must be assessed during the lab accreditation. The construction of a professional lab must be kept away from the factories with noise and vibration generally, and it is better not to build a lab beside the street because the passing trucks will bring strong vibration to the ground floor of frontage of the lab building.
2. Grounding protection measures should be taken instead of neutral earthing, as it is very important for lab.
3. The lab prone to produce harmful and toxic gases should be located on the top floor of the lab building. The fume hood should be designed with an induced draft fan which is placed higher than the fume hood and preferably on the roof. Two or three fume hoods located at other floors can be connected to each other, sharing an air duct and a large-flow induced draft fan.
Brand, size, material, color, etc.
【Entry name】:The Overall Solutions of STI Lab
【Project area】:7000m2
【Project results】:Completed lab design and furnishing; got CMA\CATL\CNAS certificates.
【Entry name】:BGI (Hunan) Lab Design
【Project area】:6000m2
【Project results】:BGI (Hunan) Lab Design
【Entry name】:Lab Construction of Guangdong Institute for Drug Control
【Project area】:4100 m2
【Project results】:Completed lab construction and passed lab acceptance
【Entry name】:The Overall Technical Solutions of the Biomedical Testing Center of Shanxi Pharmaceutical Group Co.
【Project area】:13,500 m2
【Project results】:The lab construction drawings have been confirmed; the lab is under construction.
【Entry name】:Construction of Food Testing Lab of Shenzhen Metrology Institute
【Project area】:3,800 m2
【Project results】:Completed the planning and construction of lab; passed the acceptance.