【Entry name】:Lab Construction of Guangdong Institute for Drug Control
【Project area】:4100 m2
【Project results】:Completed lab construction and passed lab acceptance
Concrete, mortar, steel bar and other materials are important materials for building materials and engineering laboratory routine testing projects, and are important building materials for building projects. Therefore, their performance directly affects the construction safety and quality of construction projects. Building materials and engineering laboratories include aggregate and rock laboratory, cement laboratory, cement concrete laboratory, asphalt laboratory, asphalt mixture laboratory and press laboratory.
1. Placement of the testing machine should be horizontal and level. Most of the testing machines are heavy. The bearing capacity of the floor and the test bed should be considered.
2. Laboratory grounding protection is also a very important issue. Multiple grounding protection measures should be adopted instead of grounding with zero connection.
3. In determining the land area, the reserved area for later development should be considered. With the rapid development of the industry, testing projects and testing equipment are constantly updated and increased. In order to better meet the testing needs, sufficient space should be reserved for later construction in the early planning stage.
Brand, size, material, color, etc.
【Entry name】:Lab Construction of Guangdong Institute for Drug Control
【Project area】:4100 m2
【Project results】:Completed lab construction and passed lab acceptance
【Entry name】:BGI (Hunan) Lab Design
【Project area】:6000m2
【Project results】:BGI (Hunan) Lab Design
【Entry name】:The Overall Technical Solutions of the Biomedical Testing Center of Shanxi Pharmaceutical Group Co.
【Project area】:13,500 m2
【Project results】:The lab construction drawings have been confirmed; the lab is under construction.
【Entry name】:Construction of Food Testing Lab of Shenzhen Metrology Institute
【Project area】:3,800 m2
【Project results】:Completed the planning and construction of lab; passed the acceptance.
【Entry name】:The Overall Solutions of STI Lab
【Project area】:7000m2
【Project results】:Completed lab design and furnishing; got CMA\CATL\CNAS certificates.