【Entry name】:Lab Construction of Guangdong Institute for Drug Control
【Project area】:4100 m2
【Project results】:Completed lab construction and passed lab acceptance
Electronics and Electrical Laboratory is a large type of laboratory, including many laboratory testing projects. To build a complete electronic and electrical laboratory, it is necessary to have general function room, EMC function room, safety and regulation laboratory function room, failure analysis laboratory function room and reliability laboratory function room. These functions basically have the ability to test all electronic and electrical items. In the decoration of electronic and electrical laboratories, the decoration and construction of darkroom shielding room is the most important. Because darkroom shielding room is used for EMC testing, which is made of a large number of metal materials, it is a high-value test environment platform.
1. General function room: office area, sample room, reference room, tea room, conference room, leisure service area.
2. EMC Laboratory Function Room: Shielding Room, Power Amplifier Room, Rectification Room, Radio Anechoic Room, OTA Anechoic Room, EMS Laboratory
3. Safety Lab Function Room: Safety Lab, Combustion Lab, Temperature Rise Lab.
4. Reliability Laboratory Function Room: Aging Laboratory, Constant Temperature and Humidity Laboratory, Dust-proof Laboratory, Waterproof Laboratory, Rapid Temperature Change Laboratory, HALT Laboratory, Salt Spray Laboratory, Impact Laboratory, Three Comprehensive Laboratories.
5. Functional rooms of failure analysis laboratory: sample preparation room, microscopic analysis laboratory, scanning electron microscopy laboratory, thermal analysis laboratory, transmission electron microscopy laboratory, X-ray analysis laboratory, mechanics laboratory, energy spectrum analysis laboratory, spectrum analysis laboratory, cleanliness test laboratory.
Brand, size, material, color, etc.
【Entry name】:Lab Construction of Guangdong Institute for Drug Control
【Project area】:4100 m2
【Project results】:Completed lab construction and passed lab acceptance
【Entry name】:The Overall Solutions of STI Lab
【Project area】:7000m2
【Project results】:Completed lab design and furnishing; got CMA\CATL\CNAS certificates.
【Entry name】:The Overall Technical Solutions of the Biomedical Testing Center of Shanxi Pharmaceutical Group Co.
【Project area】:13,500 m2
【Project results】:The lab construction drawings have been confirmed; the lab is under construction.
【Entry name】:BGI (Hunan) Lab Design
【Project area】:6000m2
【Project results】:BGI (Hunan) Lab Design
【Entry name】:Construction of Food Testing Lab of Shenzhen Metrology Institute
【Project area】:3,800 m2
【Project results】:Completed the planning and construction of lab; passed the acceptance.